
Loading Begins for a 12-Container Export Order
Shandong Lumei Traffic Facilities Co., Ltd. began loading a newly confirmed overseas order covering 12 planned 40HQ containers of thermoplastic road marking paint and supporting reflective glass beads.
Loading started on a Sunday, with the factory team coordinating cargo preparation and container loading in the yard. The order is being handled in stages according to the agreed delivery plan and logistics schedule, rather than loading all 12 containers at once.
Thermoplastic Paint and Supporting Glass Beads
The order specifies thermoplastic road marking paint supplied to the agreed JT/T 280-2022 requirements, together with reflective glass beads for the customer’s marking work.
Our thermoplastic road marking paint is supplied as bagged solid material for melting during application. For each order, the selected formulation, color, glass bead requirements and inspection documents should correspond to the confirmed purchasing specification.
Supplying paint and supporting beads together helps the customer coordinate material procurement. Their use during construction still needs to follow the project specification and the recommended application procedure.

Phased Dispatch through Qingdao Port
The shipment plan involves loading the prepared cargo in batches and transporting the containers to Qingdao Port.
Factory dispatch is coordinated with trucking arrangements, port receiving requirements and the proposed vessel schedule. Container loading marks one stage of the delivery process; port handover and vessel departure are separate milestones.
Staged shipment planning allows the team to organize cargo readiness and loading work against the agreed order schedule.
Package and Quantity Checks before Dispatch
Before each container is dispatched, the loading team checks the prepared goods against the shipment records. Key items include:
Product identification and package condition.
Quantities of paint and supporting glass beads.
Bag closure and protection against moisture exposure.
Cargo arrangement and securing inside the container.
Consistency between the loaded goods and packing list.
Loading photographs provide a useful record of package condition and cargo arrangement. These records complement product inspection documents and help the customer follow the shipment preparation process.
Container utilization must be considered together with permitted weight and suitable cargo securing, rather than space alone.
Coordinating Documents and Transport Requirements
The document package is prepared according to the actual products, contract and shipment requirements. Relevant information may include commercial invoices, packing lists, technical data sheets, safety data sheets and available inspection reports.
Transport classification must be confirmed for the specific formulation and supporting documentation. It should not be inferred solely from the product name or from the fact that the material is supplied in solid form.
This case records the beginning of a phased loading operation. Further shipment updates can be added as the remaining containers are dispatched and shipping milestones are confirmed.

Discuss Bulk Road Marking Material Supply
The 12-container order illustrates the coordination involved in preparing a large shipment of road marking materials, from cargo identification and packaging checks to phased loading and port delivery.
Buyers planning bulk procurement can review our guide on comparing road marking paint quotations to clarify product specifications, packaging and supply scope before ordering.
Contact LUMEI with your required paint specification, glass bead requirements, estimated quantity and destination port to discuss a suitable supply and shipment plan.
TAG:












